Thursday 20 June 2013

Thinking outside the box

Those of you who have even a slight mechanic’s mind will love this.
You don’t have to be an engineer to appreciate this story...

 
 A toothpaste factory had a problem. They sometimes shipped empty boxes without the tube of toothpaste inside. This challenged their perceived quality with the buyers and distributors. Understanding how important the relationship with them was, the CEO of the company assembled all of his top people. They decided to hire an external engineering company to solve their empty boxes problem. The project followed the usual process: budget and project sponsor allocated, RFP, and third-parties selected.
Six months (and $8 million) later they had a fantastic solutution - on time, on budget, and high quality. Everyone in the project was pleased.

They solved the problem by using a high-tech precision scale that would sound a bell and flash lights whenever a toothpaste box weighed less than it should. The line would stop, someone would walk over, remove the defective box, and then press another button to re-start the line. As a result of the new package monitoring process, no empty boxes were being shipped out of the factory.

With no more customer complaints, the CEO felt the $8 million was well spent. At the end of the first month, he reviewed the line statistics report and discovered the number of empty boxes picked up by the scale in the first week was consistent with projections, however, the next three weeks were zero! The estimated rate should have been at least a dozen boxes a day. He had the engineers check the equipment and they verified the report as accurate.
Puzzled, the CEO travelled down to the factory, viewed the part of the line where the precision scale was installed, and observed that just ahead of the new $8 million dollar solution sat a $20 desk fan blowing the empty boxes off the belt and into a bin. He asked the line supervisor what that was about.

"Oh, that," the supervisor replied,"Bert, the kid from maintenance, put it there because he was tired of walking over, removing the box and re-starting the line every time the bloody bell rang.”

No comments: